2nd Dk. Lifting Gear for Armor Hatch to Carpenter Shop (Major Alterations) 3rd Dk.
Creation Information
Context
Contact Us
Subjects
Help Map this Technical Drawing
Tell us if you know the precise location of this item. In the lower-left corner of map below, select either the pin () or the box (). Drop a pin or drag to create a new rectangle. Zoom and Pan the map as needed.
Mapped Locations
2nd Dk. Lifting Gear for Armor Hatch to Carpenter Shop (Major Alterations) 3rd Dk., technical drawing, July 29, 1926; (https://texashistory.unt.edu/ark:/67531/metapth887096/: accessed May 20, 2024), University of North Texas Libraries, The Portal to Texas History, https://texashistory.unt.edu; crediting Texas Parks & Wildlife Department.