Imperial Sugar Company Actual Operations: 1972 Page: 1 of 4
[2] p. ; 28 cm.View a full description of this report.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
IMPERIAL SUGAR COMPANY
ACUAL OPERATIONS - YEAR 1972
(In Cwts.)1
January 3, 1973
OPERATIONS
RATE/DAY
PRODUCTION
SHIPMENTS ON HAND
JaInua r y
Shrutdown l I ;
February
Shutdown 2/11.7 days /wk.
5 days /wk.March
Plus 1 Sat.
& 31*.5 days/wk.
Shutdown 3 /24Apriii
Plus 2 Sats.
Jun e
Plus 2 Suns.Shutdown 7/23.
August
Plus 1 Sun.September
Plus 1 Sun.
October
Plus 1 Sun.
November5 days/wk.
including 5/29*.6 days /wk.
7 days/wk.
6 days/wk.6 days/wk.
Shutdo wn 9/4'.
5 days /wk.
Shutdown 10/27.22
20
2530
2822
5 days/wk.
Shutdown 11/23* & 24-,,.
December 5 days /wk.
Shutdown 12/25*.TOIA ,
20
20
28829. 4M
30. OM
29. 2M
30. IM
29. 7M
31. 4M
29. 9M
32. 2M
30. 9M
31. 8M
30. GM645 813
599 705
730 678
811 909
891 010
879 045
777 535
708 096
601 638
635 458
8 u33 218653 196 217 710
666 462 182 080750 471
833 189
862 142
865 163163 800
152 240
185 080197 320
787 314 173 880
691 507 217 180
656 511 154 300648 809
8 652 731132 980
*HIoliday
MNIV'tiIi:
DAY
28
2027. 4M
29. 3M7 7 235
585 096719 804
518 163186 930
244 400, ays/wk.
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Imperial Sugar Company. Imperial Sugar Company Actual Operations: 1972, report, January 3, 1973; (https://texashistory.unt.edu/ark:/67531/metapth1211590/m1/1/: accessed June 13, 2024), University of North Texas Libraries, The Portal to Texas History, https://texashistory.unt.edu; crediting Rosenberg Library.