Tittle-Luther/Parkhill, Smith and Cooper, Inc. - 370 Matching Results

Search Results

Abilene State Hospital Men's Dormitory, Abilene, Texas: Floor plans

Description: Floor plans for a men's dormitory building at Abilene State Hospital in Abilene, Texas. It includes a floor plan for both the first and second floors of the building; each plan notes the location for each room, doorway, hallway, and unit heaters. The drawings on the right side of the sheet detail the installation of the united heaters.
Date: May 5, 1931
Creator: David S. Castle Co.

Abilene State Hospital Men's Dormitory, Abilene, Texas: Second Floor Mechanical Plan

Description: Mechanical plan for a men's dormitory building at Abilene State Hospital in Abilene, Texas. It includes a drawing of the floor plan for the second floor with notations written in red ink detailing the plumbing, heating, and electrical work. There is a diagram at the top detailing the installation of concealed unit heaters, and another diagram of the plumbing riser.
Date: May 5, 1931
Creator: David S. Castle Co.

Abilene State Hospital Men's Dormitory, Abilene, Texas: Second Floor Plans

Description: Framing plan for the second floor and roof of a men's dormitory building at Abilene State Hospital in Abilene, Texas. It includes a drawing of the planned framework for the second floor and the roof; the drawings are highlighted by red ink showing the details of the framing. The drawings on the right side of the sheet show elevation details, and a schedule detailing the beams and joists.
Date: May 5, 1931
Creator: David S. Castle Co.

Army Mobilization Buildings: Duct Shaft Details

Description: Duct shaft details for mobilization buildings in support of war efforts. They include detail thru duct shaft that is vertical to wall, detail thru duct shaft that is parallel to wall, plan above roof detail of smoke pipe for one story building, and other mechanical sections.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.

Army Mobilization Buildings: Electrical Details

Description: Electrical details for mobilization buildings in support of war efforts. They include explosion proof fixtures, waterproof fixture, reflected plan, typical service diagram, weatherproof fixture with mounting for concealed work and mounting for exposed work, and a legend.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.

Army Mobilization Buildings: Floor Plans

Description: Floor plans for mobilization buildings in support of war efforts. They include floor plan type L-5 (200 Men), floor plan type L-6 (250 Men), typical elevations, floor plan type L-3 (100 Men), floor plan type L-1 (25 Men), floor plan type L-2 (50 Men), floor plan type L-4 (150 Men), heater room end elevation, toilet room end elevation, notes, gas fired heating cabinets chart, electric fixture schedule, and elevation detail.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.

Army Mobilization Buildings: Floor Plans

Description: Floor plans for mobilization buildings in support of war efforts. They include floor plan type L-5 (200 Men), floor plan type L-6 (250 Men), typical elevations, floor plan type L-3 (100 Men), floor plan type L-1 (25 Men), floor plan type L-2 (50 Men), floor plan type L-4 (150 Men), heater room end elevation, toilet room end elevation, notes, gas fired heating cabinets chart, electric fixture schedule, and elevation detail.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.

Army Mobilization Buildings: Floor Plans

Description: Floor plans for mobilization buildings in support of war efforts. They include floor plan type L-5 (200 Men), floor plan type L-6 (250 Men), typical elevations, floor plan type L-3 (100 Men), floor plan type L-1 (25 Men), floor plan type L-2 (50 Men), floor plan type L-4 (150 Men), heater room end elevation, toilet room end elevation, notes, gas fired heating cabinets chart, electric fixture schedule, and elevation detail.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.

Army Mobilization Buildings: Floor Plans

Description: Floor plans for mobilization buildings in support of war efforts. They include floor plan type L-5 (200 Men), floor plan type L-6 (250 Men), typical elevations, floor plan type L-3 (100 Men), floor plan type L-1 (25 Men), floor plan type L-2 (50 Men), floor plan type L-4 (150 Men), heater room end elevation, toilet room end elevation, notes, gas fired heating cabinets chart, electric fixture schedule, and elevation detail.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.

Army Mobilization Buildings: Floor Plans

Description: Floor plans for mobilization buildings in support of war efforts. They include floor plan type L-5 (200 Men), floor plan type L-6 (250 Men), typical elevations, floor plan type L-3 (100 Men), floor plan type L-1 (25 Men), floor plan type L-2 (50 Men), floor plan type L-4 (150 Men), heater room end elevation, toilet room end elevation, notes, gas fired heating cabinets chart, electric fixture schedule, and elevation detail.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Back to Top of Screen