Tittle-Luther/Parkhill, Smith and Cooper, Inc. - 294 Matching Results

This system will be undergoing maintenance May 23rd between 9:00AM and 12:00PM CDT.

Search Results

Army Mobilization Buildings: Plumbing Details

Description: Plumbing details for mobilization buildings in support of war efforts. They include hot water heater connections to range boiler or vertical h.w. storage tank, hot water heater connections for horizontal h.w. storage tank, connections for vertical h.w. generator, gas hot water heater connections for h.w. storage tank, pipe stand for vertical hot water storage tank, method of installing range boilers in battery, schedule for hot water tank connection & accessories, lavatories in battery, wall hu… more
Date: August 1, 1940
Creator: United States. Office of the Quartermaster General. Construction Division.

Big Lake High School Academic Building: Wall Sections

Description: Architectural plan for a high school building in the Reagan County Independent School District. It includes drawings of wall sections at the North, South, and East entrances of the building; each drawing has measurements and specifications concerning the materials. Other drawings include details concerning interior and exterior doors.
Date: November 1, 1954
Creator: David S. Castle Co.

Big Lake High School Auditorium: Elevations

Description: Architectural plan for a high school building in the Reagan County Independent School District. It includes four drawings that detail the elevation of the building from the North, South, East, and West sides of the building. The drawings on the right of the sheet detail the women's lounge vanity and the assembly room speaker.
Date: November 1, 1954
Creator: David S. Castle Co.

Big Lake High School Cafeteria: Floor Plan and Schedules

Description: Architectural plan for a high school cafeteria in the Reagan County Independent School District. It includes drawings showing the floor plan for the building as well as an elevation plan of the North, South, East, and West sides of the building. The drawings on the left side of the sheet show a room finish schedule, and door schedule, a window schedule, and details of the door frames.
Date: November 1, 1954
Creator: David S. Castle Co.

Big Lake High School: Covered Passage Work

Description: Architectural plan for a covered passageway at a high school in the Reagan County Independent School District. It includes drawings of the passage are as well as its location in relation to the buildings that make up the whole school. Also included are drawings of the steal beams supporting the covered passage.
Date: November 1, 1954
Creator: David S. Castle Co.
Back to Top of Screen