David S. Castle Architectural Drawings - 100 Matching Results

Search Results

Additions To Weinert Public School, Weinert, Texas: Rear Elevation & Roof Plan

Description: Rear elevation and roof plan for a school building. They feature wall edge lines, measurements, notes, and labels. The rear elevation rendering also has windows, stairs, chimneys, and doors. Other sections include 1/2" detail of section thru stage, and 1 1/2" detail of awning at front entrance.
Date: June 23, 1923
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Administration Building, Abilene, Texas: Elevation Renderings

Description: Elevation renderings for an administration building for the Abilene Independent School District in Abilene, Texas. Sections include elevation of tool storage library wing, east elevation for library wing, west elevation of library wing, north elevation of cafeteria wing in library wing, north elevation of classroom wing, west elevation of classroom wing, east elevation of classroom wing, south elevation of classroom wing, and south elevation of library wing.
Date: November 23, 1959
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

F & M State Bank, Ranger, Texas: Floor & Roof Plans

Description: Floor and roof plans for a bank commissioned by F & M State Bank in Ranger, Texas. The floor plan has wall boundary lines, measurements, labels, and door orientation lines. The roof plan has wall boundary lines, measurements, and information. Two other sections are named rear elevation, and front elevation. Rear elevation has wall lines and windows. Front elevation has windows, a door, roof overhang extension, measurements, and wall lines.
Date: March 23, 1918
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

F & M State Bank, Ranger, Texas: Front Entrance & Vault Partition Renderings

Description: Front entrance and vault partition renderings for a bank commissioned by F & M State Bank in Ranger, Texas. The front entrance has wall texture lines, a door, trim design near the roof, a column, and height measurements. The vault partition has a grid mesh, vertical support bars, and labels.
Date: March 23, 1918
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

F & M State Bank, Ranger, Texas: Side & Cross Elevation Renderings

Description: Side and cross elevation renderings for a bank commissioned by F & M State Bank in Ranger, Texas. The side elevation rendering has doors, windows, entrance roof overhang, a measurement, and a note. The cross section rendering has wall boundaries with spiral lines, a door, measurements, beams, and labels.
Date: March 23, 1918
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

First Baptist Church, Big Lake, Texas: Supplemental Stone Details

Description: Detail plan for the First Baptist Church in Big Lake, Texas. It includes diagrams of sections "A-A" and detail B, elevation of east windows, side and front elevations, elevation at main entrance, detail of buttress caps, elevation of coping, and section thru coping.
Date: December 23, 1950
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Grace Hotel Additions, Abilene, Texas: First Floor Mechanical Plan

Description: Mechanical plan for additions to the Grace Hotel in Abilene, Texas. It includes a detailed mechanical plan for the first floor showing electrical, plumbing, and heating work. There is also a radiator relocation schedule, codes, and notes.
Date: July 23, 1923
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

A Gymnasium For Wingate Independent School District, Wingate, Texas: Foundation & Floor Framing Plan

Description: Foundation and floor framing plan for a school building. It features wall edge lines, measurements, framing lines, and labels. Other sections include a pier & footing schedule, grade beam schedule, typical grade beam steel placement diagram, section thru bleacher, column buttress detail, typical riser connection, typical pier & footing, typical footing with no pier, and beam sections.
Date: May 23, 1954
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Malcom Shop Building, Abilene, Texas: Door Details

Description: Door details for a shop building commissioned by J. Floyd Malcom in Abilene, Texas. Sections include full size base, full size picture mould, full size oak thresholds, full size ceiling mould, side jambs for doors and breeze transoms in 5 1/2" walls, side jamb, and sill section.
Date: April 23, 1943
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.
Back to Top of Screen