Ballinger High School: Second Story Framing Plan
Description:
Architectural plan for a high school building in Ballinger, Texas. It includes drawings that detail the overall framing plan for the floor, various staircases, and beams 217, and 218; there is a beam schedule for the second story created in the top left corner of the sheet.
Date:
February 10, 1925
Creator:
David S. Castle Co.
Item Type:
Refine your search to only
Technical Drawing
Partner:
Tittle-Luther/Parkhill, Smith and Cooper, Inc.