48 Matching Results

Search Results

Advanced search parameters have been applied.

Plans For A High School Building, Winters, Texas: 2nd Floor Framing Plan

Description: Second floor framing plan for a school building. It features wall edge lines, measurements, room names, and labels. Other sections include 2nd floor joist schedule, stair rendering, and ceiling construction.
Date: April 2, 1926
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Plans For Tahoka High School, Tahoka, Texas: Basement Floor

Description: Basement plan for a school building. It features wall edge lines, measurements, labels, and notes. The plan focuses on mechanical details for plumbing, heating, & electrical work.
Date: June 22, 1926
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Plans For A High School Building, Winters, Texas: Third Floor Plan

Description: Third floor plan for a school building. It features wall edge lines, measurements, labels, mechanical lines, and room names. A riser diagram is included to the left and right.
Date: April 2, 1926
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Two Story Store Building, Abilene, Texas: Roof Plan

Description: Roof plan for a two story store building commissioned by Mr. Chas Motz in Abilene, Texas. It includes measurements, labels, notes, and wall boundary lines. Other sections include a stair diagram, side tie beams, skylight in roof, rear tie beam, panel detail front elevation, and 3" detail of plate glass windows.
Date: December 5, 1926
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Plans For A Gymnasium For McMurry College, Abilene, Texas: Floor Plan

Description: Floor plan for a school building. It features wall edge lines, measurements, and labels. Other sections include a section above grand stand, window schedule, door schedule, and wall section B-B.
Date: August 5, 1926
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Plans For Tahoka High School, Tahoka, Texas: First Floor Plan

Description: First floor plan for a school building. It features wall edge lines, measurements, labels, and room names. A window schedule is included to the bottom left.
Date: June 22, 1926
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Plans For A One Story School Building, Stamford, Texas: Foundation & Framing Plan

Description: Foundation & framing plan for a school building. It features wall edge lines, measurements, labels, column placement, and framing lines. Other sections include a column and footing schedule, section thru tie beam, typical inside footing, and beam sections.
Date: September 1, 1926
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Plans For A High School Building, Winters, Texas: Stair, Railing, Riser, & Tread Details

Description: Stair, railings, riser, and tread details for a school building. Sections include 3" details of railings risers & treads, side elevation at landing, section of treads & risers, detail of proscenium, section of stair rail, stair diagram, and moldings for auditorium ceiling.
Date: April 2, 1926
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Business Building, Big Spring, Texas: Trim Renderings

Description: Trim renderings for a business building commissioned by H. Clay Read in Big Spring, Texas. They include various parts of trim and railing.
Date: 1926
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Plans For Tahoka Ward School, Tahoka, Texas: Door, Window, & Elevation Details

Description: Door, window, and elevation details for a school building. Sections include a door diagram, detail of wardrobe shelf, wardrobe elevation, details of blackboard construction, detail of doors, detail of double hung windows, and details of pupils wardrobe.
Date: June 22, 1926
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Two Story Store Building, Abilene, Texas: First Floor Plan

Description: First floor plan for a two story store building commissioned by Mr. Chas Motz in Abilene, Texas. It includes measurements, room names, labels, and wall boundary lines. Other sections include a door schedule and window schedule.
Date: December 5, 1926
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Plans For A One Story School Building: Rear & Front Elevation

Description: Front & rear elevation plan for a school building. They feature base boundary lines, measurements, labels, wall texture lines, doors, and windows.
Date: April 1, 1926
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Two Story Store Building, Abilene, Texas: Second Floor Plan

Description: Second floor plan for a two story store building commissioned by Mr. Chas Motz in Abilene, Texas. It includes measurements, labels, directional arrows, and wall boundary lines. Other sections include 3" detail of d.h. window with and without transom, and detail of brick pattern.
Date: December 1926
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.
Back to Top of Screen