311 Matching Results

Search Results

Big Lake High School Gymnasium: Mechanical Floor Plan

Description: Architectural plan for a high school gymnasium in Big Lake, Texas. It includes a mechanical floor plan that details the building's plumbing, heating, and electrical systems. There is a list in the upper left corner of the sheet that contains the different symbols used for each system.
Date: May 10, 1938
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Big Lake High School Gymnasium: Scheme "A" Floor Plan

Description: Architectural plan for a high school gymnasium in Big Lake, Texas. It includes a drawing of the building's scheme "A" floor plan, with smaller drawings of various specifications accompanying it. Also included is a room finish schedule, window schedule, and door schedule specifying the materials to be used in their construction.
Date: May 10, 1938
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Big Lake High School Gymnasium: Floor Plan

Description: Architectural plan for a high school gymnasium in Big Lake, Texas. It includes a floor plan of the building and multiple schedules that outline the finishes to be used for the individual rooms, windows, and doors. According to the sheet, the floor plan represents "scheme B" of the steel truss construction.
Date: May 10, 1938
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

School Cafeteria, Big Lake, Texas: Foundation Plan

Description: Foundation plan for a cafeteria building in the Reagan County Independent School District. It includes a sketch for the building's foundation plan, and smaller drawings that highlight specific sections of the foundation. Also included are construction schedules that contain details about the materials to be used in construction.
Date: May 15, 1949
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

School Cafeteria, Big Lake, Texas: Roof Framing Plan

Description: Architectural plan for a cafeteria building in the Reagan County Independent School District. It includes a drawing of the planned roofing framework and smaller drawings that detail individual sections of the framework; a tie beam schedule is drawn at the top of the sheet detailing specifications for individual tie beams.
Date: May 15, 1949
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.
Back to Top of Screen